Skip to Content

Choosing a Steel Fabrication Subcontractor in Dubai

What to check before you award cutting, bending, welding and finishing
October 20, 2026 by

Most delays on a steel job come from the gaps between suppliers: one for cutting, one for bending, one for welding, one for finishing. Choosing a fabrication subcontractor is mostly about how many of those gaps you have to manage yourself.

What to look for

  • Processes under one roof: cutting, CNC bending, welding and finishing in one workshop mean fewer hand-offs and one party responsible for the part.
  • Heavy-section capability: ask for the actual limits, not a general claim. Ours: beams up to 1,000 mm wide and 12 m long, tube and pipe up to Ø650 mm, plate up to 50 mm mild steel.
  • Files in, not only paper: a shop that works from DXF, STEP and NC1/DSTV files avoids retyping errors.
  • Quality system: look for certified management systems. Morshedi is certified to ISO 9001:2015, ISO 14001:2015 and ISO 45001:2018.
  • Clear quotes: a quote should state material, quantity, finish and delivery date, so you can compare like with like.
  • Location: a workshop in Dubai Industrial City is close to Dubai and the other emirates, which keeps deliveries short.

Structural steel building frame with metal decking, fabricated in Dubai by Morshedi

Questions to ask any subcontractor

  1. Which of cutting, bending, welding and finishing do you do in your own workshop?
  2. What are your largest beam, tube and plate sizes?
  3. Which file formats can you work from?
  4. What inspection documents can you supply?
  5. Can you show similar completed projects?

Fabricated steel beams with welded stiffeners, Morshedi Dubai

See our projects, then send your drawings for a fabrication quote or call +971 4 566 7219.

Request a Quote

Cutting Thick Steel Plate by Laser: What to Plan For
Mild steel up to 50 mm, bevels up to 45 degrees, beds to 12 m
Get a Quote طلب عرض أسعار